Our operators has done a lift at the Valero refinery with a 1000 ton crane, after a year of preparation. The lifting weight was 450,000 lb, and the configuration was 340 ft boom, 135 ft radius and 1,124,000 lb on the Maxer. A great team at the construction site with passionate people. A great success!